Prime Contractor will perform all work as described in the construction design record drawings to include but not limited to; demolition of existing structures identified in the record drawings, removal of existing and installation of mechanical equipment, removal of existing and installation of electrical equipment, removal of existing and installation of plumbing infrastructure and fixtures, removal of existing and installation of structural as indicated on the record drawings, removal and installation of fire suppression system, interior/exterior painting to include prep work, new flooring and landscaping throughout the identified construction zone as indicated in the construction set of design drawings.